Highland Valley Copper Mill Optimization Project
Fluor completed the pre-feasibility study for modernization of the Highland Valley Copper Mine concentrator and performed engineering, procurement and construction management (EPCM) services for this 125,000 tons per day (tpd) open-pit copper-molybdenum mine.
The project covered upgrades to, and expansion of, the existing grinding and flotation facilities including a new pebble crushing facility, replacement of the existing flotation circuits with a new, stand-alone, bulk flotation building, and implementation of a redundant electrical system. The new bulk flotation building also included upgrades to molybdenum flotation, reagents, lime slaking, and water reclaim circuits. The project was designed to increase average throughput by approximately 10 percent, from approximately 120,000 tpd to over 130,000 tpd over the life of the mine.
Conclusion
HVMO assisted Teck in meeting its commitment to hiring qualified local contractors and First Nations suppliers who demonstrated core safety values that complemented the construction effort. The resources of Fluor’s joint venture partner allowed contractors who perform work in the field to participate in front-end engineering and planning and to have input into constructability. In addition, HVMO’s integrated workface planning and alignment of construction and engineering enabled the optimization of productivity throughout construction of the project./SiteCollectionImages/Projects/teck-highland-valley-copper-mill/HVC-MOP-Site-Overall-1-Good-es.jpg, Teck Highland Valley Copper Mill Optimization Project
teck-highland-valley-copper-mill
326;#Cerro Verde Production Unit Expansion;#424;#Safford Leach Copper Mine;#324;#Quellaveco Open Pit Copper Mine
5;#Mining, Metals & Fertilizers;#53;#Mining;#54;#Mining Process Expertise;#6;#Urban Solutions
False
1;#North America
10-105